0

I am modelling earthmoving operation. Every trench agent seize two transporters, one excavator, and one truck. When truck is released it will do some other job before been seized again by the same trench. So this process repeat until the trench will be empty.

The process is occuring for two three times without any problem but after two three times the trench agent is not go out of the seizeTransporter block (the one that seize truck). I have a delay block after the seizeTransporter block and it use Maximum Capacity. So it should not be a problem and it should not prevent the seizeTransporter block out port to push the trench out.

I noticed this is hapenning when the truck stop to resolve a collision. It looks like the collision cannot be resolved and the truck stay where it is for ever. :))

enter image description here

I have tried so many things that could solve this problem but none of them works.

Any Advice please. Thank you.

4

1 回答 1

0

材料处理库元素中有一个选项可以在TransporterControl一段时间后覆盖传输器冲突。可能会减少 10 个模型时间单位的默认超时,见下文:

在此处输入图像描述

于 2021-03-26T07:54:36.147 回答