0

I have a SQL job schedule to run daily. There are 8 jobs running with the same schedule. 6 jobs run properly. The remaining two run only once when i start the jobs manually, subsequent recurring runs never happen. There is no information about these two in job history.

It looks like the scheduler does not invoke the mentioned two jobs at all.

4

1 回答 1

0

解决方法:将计划设置为每 24 小时运行一次,添加开始时间和结束时间,间隔为 30 分钟。

于 2013-10-29T11:18:43.363 回答